===== 项目目标 ===== 支撑2000tps,999rt在10ms以内 ===== 确定里程碑的时间点 ===== {{:pasted:20161128-214325.png}} ===== 详细计划及资源分片(画出甘特图) ===== {{:pasted:20161128-214436.png}} {{:pasted:20161128-214627.png}} ===== 风险预估,规避方案,对项目进度的影响 ===== {{:pasted:20161128-214519.png}}